Laporan Biaya Pokok Produksi (HPP)

Evaluasi komparatif anggaran (BGT) vs realisasi (AKT) biaya pemeliharaan, panen & pengangkutan, serta alokasi overhead.

Data Biaya Bulanan (Biaya Pokok Produksi)

Panel Aksi Fitur & Pengelolaan Tabel Data

download Template Excel
NO SANDI JENIS PEKERJAAN / URAIAN PEKERJAAN BULAN FEBRUARI SD BULAN FEBRUARI VARIANCE BI VARIANCE SDBI
BGT AKT BGT AKT
10.717 Ha 11.389 Ha 10.717 Ha 11.389 Ha
16.553.169 Kg 16.510.970 Kg 33.280.236 Kg 35.853.990 Kg
1,54 Ton/Ha 1,45 Ton/Ha 3,11 Ton/Ha 3,15 Ton/Ha
Total Rp/Ha Total Rp/Ha Total Rp/Ha Total Rp/Ha Rp % Rp %
A. A. BIAYA PEMELIHARAAN KEBUN (TANAMAN MENGHASILKAN)
600.10.00000 Biaya Pengawas 196.674.821 18.352 197.356.295 17.329 393.349.642 36.703 412.652.123 36.233 -681.474 -0.4% -19.302.481 -4.9%
600.11 Biaya Pemeliharaan Jalan & Jembatan 699.324.783 65.254 496.599.549 43.603 1.398.649.566 130.508 1.243.597.638 109.193 202.725.234 29.0% 155.051.928 11.1%
600.12 Biaya Pemeliharaan Saluran Air 149.489.059 13.949 4.455.272 391 298.978.118 27.898 6.661.013 585 145.033.787 97.0% 292.317.105 97.8%
600.13 Biaya Pemeliharaan Bangunan Konservasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.15 Biaya Menyisip 27.851.562 2.599 6.755.645 593 55.703.124 5.198 25.615.202 2.249 21.095.917 75.7% 30.087.922 54.0%
600.17 Biaya Pengendalian Lalang 9.503.404 887 0 0 19.006.808 1.774 0 0 9.503.404 100.0% 19.006.808 100.0%
600.18 Pemeliharaan Gawangan 362.781.183 33.851 389.449.046 34.195 725.562.366 67.702 743.389.670 65.273 -26.667.863 -7.4% -17.827.304 -2.5%
600.19 Pemeliharaan Piringan 271.405.351 25.325 304.573.337 26.743 542.810.702 50.650 539.699.042 47.388 -33.167.986 -12.2% 3.111.660 0.6%
600.2 Pemeliharaan Pasar Pikul & TPH 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.21 Titi Panen 5.130.222 479 0 0 10.260.444 957 0 0 5.130.222 100.0% 10.260.444 100.0%
600.22 Biaya Pengendalian Hama dan Penyakit 52.123.844 4.864 107.626.723 9.450 104.247.688 9.727 223.160.820 19.594 -55.502.879 -106.5% -118.913.132 -114.1%
600.23 Biaya Kastrasi/Sanitasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.24 Biaya Sensus 43.303.640 4.041 0 0 86.607.280 8.081 448.198 39 43.303.640 100.0% 86.159.082 99.5%
600.25 Konsolidasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.26.00000 Peralatan & Perlengkapan 13.645.849 1.273 60.678.142 5.328 26.753.352 2.496 75.499.171 6.629 -47.032.293 -344.7% -48.745.819 -182.2%
600.27 Biaya Analisa 10.032.898 936 28.705.118 2.520 20.065.796 1.872 82.893.811 7.278 -18.672.220 -186.1% -62.828.015 -313.1%
600.29.00000 Lain-Lain 862.834 81 0 0 1.725.668 161 0 0 862.834 100.0% 1.725.668 100.0%
600.3 Biaya Pemupukan 10.541.625.928 983.636 2.236.459.432 196.370 20.135.764.079 1.878.862 4.755.202.384 417.526 8.305.166.496 78.8% 15.380.561.695 76.4%
600.31 Biaya Tunas 328.231.300 30.627 278.962.705 24.494 656.462.600 61.254 564.578.549 49.572 49.268.595 15.0% 91.884.051 14.0%
SUBTOTAL SUB TOTAL BIAYA PEMELIHARAAN KEBUN (A) 12.711.986.678 1.186.152 4.111.621.264 361.017 24.475.947.233 2.283.843 8.673.397.621 761.559 8.600.365.414 67.7% 15.802.549.612 64.6%
B. B. BIAYA PANEN & PENGANGKUTAN TBS
601.10.00000 Gaji & Biaya Sosial Pengawas 305.980.196 28.551 223.439.971 19.619 611.960.392 57.102 447.375.455 39.281 82.540.225 27.0% 164.584.937 26.9%
601.01 Upah & Biaya Sosial Pemanen 3.676.053.240 343.011 2.642.188.876 231.995 7.398.610.812 690.362 5.308.162.416 466.078 1.033.864.364 28.1% 2.090.448.396 28.3%
601.02 Biaya Premi 839.914.136 78.372 1.039.369.834 91.261 1.685.314.452 157.256 2.285.745.725 200.698 -199.455.698 -23.8% -600.431.273 -35.6%
601.03 Peralatan Panen 40.102.390 3.742 166.264.634 14.599 80.766.261 7.536 299.597.271 26.306 -126.162.244 -314.6% -218.831.010 -270.9%
602 Biaya Pengangkutan TBS 0 0 13.546.029 1.189 0 0 34.946.691 3.068 -13.546.029 0.0% -34.946.691 0.0%
602.10 Pengangkutan TBS ke PKS 1.302.118.137 121.500 1.551.254.708 136.206 2.612.178.572 243.742 3.350.191.016 294.160 -249.136.571 -19.1% -738.012.444 -28.3%
SUBTOTAL SUB TOTAL BIAYA PANEN & PENGANGKUTAN (B) 6.164.168.099 575.177 5.636.064.052 494.869 12.388.830.489 1.155.998 11.726.018.574 1.029.592 528.104.047 8.6% 662.811.915 5.4%
A + B SUB TOTAL BIAYA LANGSUNG (A + B) 18.876.154.777 1.761.328 9.747.685.316 855.886 36.864.777.722 3.439.841 20.399.416.195 1.791.151 9.128.469.461 48.4% 16.465.361.527 44.7%
C. C. ALOKASI BIAYA TAK LANGSUNG / OVERHEAD
603.90.00000 Alokasi Biaya Tak Langsung (Umum) 2.695.094.023 251.478 3.161.681.190 277.608 5.387.109.414 502.670 6.671.632.435 585.796 -466.587.167 -17.3% -1.284.523.021 -23.8%
SUBTOTAL SUB TOTAL BIAYA TAK LANGSUNG (C) 2.695.094.023 251.478 3.161.681.190 277.608 5.387.109.414 502.670 6.671.632.435 585.796 -466.587.167 -17.3% -1.284.523.021 -23.8%
GRAND TOTAL TOTAL HPP (A + B + C) 21.571.248.800 2.012.807 12.909.366.506 1.133.494 42.251.887.136 3.942.511 27.071.048.630 2.376.947 8.661.882.294 40.2% 15.180.838.506 35.9%