Laporan Biaya Pokok Produksi (HPP)

Evaluasi komparatif anggaran (BGT) vs realisasi (AKT) biaya pemeliharaan, panen & pengangkutan, serta alokasi overhead.

Laporan Matriks Biaya Pokok Produksi (HPP)

Panel Aksi Fitur & Pengelolaan Tabel Data

download Template Excel
NO SANDI JENIS PEKERJAAN / URAIAN PEKERJAAN BULAN MARET SD BULAN MARET VARIANCE BI VARIANCE SDBI
BGT AKT BGT AKT
10.717 Ha 11.389 Ha 10.717 Ha 11.389 Ha
16.893.870 Kg 16.001.970 Kg 50.174.106 Kg 51.855.960 Kg
1,58 Ton/Ha 1,41 Ton/Ha 4,68 Ton/Ha 4,55 Ton/Ha
Total Rp/Ha Total Rp/Ha Total Rp/Ha Total Rp/Ha Rp % Rp %
A. A. BIAYA PEMELIHARAAN KEBUN (TANAMAN MENGHASILKAN)
600.10.00000 Biaya Pengawas 196.674.821 18.352 238.414.935 20.934 590.024.463 55.055 651.067.058 57.166 -41.740.114 -21.2% -61.042.595 -10.4%
600.11 Biaya Pemeliharaan Jalan & Jembatan 699.324.783 65.254 1.060.039.787 93.076 2.097.974.349 195.761 2.303.637.425 202.269 -360.715.004 -51.6% -205.663.076 -9.8%
600.12 Biaya Pemeliharaan Saluran Air 149.489.059 13.949 326.517.121 28.670 448.467.177 41.846 333.178.134 29.254 -177.028.062 -118.4% 115.289.043 25.7%
600.13 Biaya Pemeliharaan Bangunan Konservasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.15 Biaya Menyisip 27.851.562 2.599 4.421.015 388 83.554.686 7.796 30.036.217 2.637 23.430.547 84.1% 53.518.469 64.1%
600.17 Biaya Pengendalian Lalang 9.503.404 887 0 0 28.510.212 2.660 0 0 9.503.404 100.0% 28.510.212 100.0%
600.18 Pemeliharaan Gawangan 362.781.183 33.851 395.947.621 34.766 1.088.343.549 101.553 1.139.337.291 100.038 -33.166.438 -9.1% -50.993.742 -4.7%
600.19 Pemeliharaan Piringan 271.405.351 25.325 238.120.081 20.908 814.216.053 75.974 777.819.123 68.296 33.285.270 12.3% 36.396.930 4.5%
600.2 Pemeliharaan Pasar Pikul & TPH 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.21 Titi Panen 5.130.222 479 0 0 15.390.666 1.436 0 0 5.130.222 100.0% 15.390.666 100.0%
600.22 Biaya Pengendalian Hama dan Penyakit 52.123.844 4.864 -60.677.184 -5.328 156.371.532 14.591 162.483.636 14.267 112.801.028 216.4% -6.112.104 -3.9%
600.23 Biaya Kastrasi/Sanitasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.24 Biaya Sensus 43.303.640 4.041 0 0 129.910.920 12.122 448.198 39 43.303.640 100.0% 129.462.722 99.7%
600.25 Konsolidasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.26.00000 Peralatan & Perlengkapan 7.183.486 670 13.718.379 1.205 33.936.838 3.167 89.217.550 7.834 -6.534.893 -91.0% -55.280.712 -162.9%
600.27 Biaya Analisa 10.032.898 936 0 0 30.098.694 2.809 82.893.811 7.278 10.032.898 100.0% -52.795.117 -175.4%
600.29.00000 Lain-Lain 862.834 81 0 0 2.588.502 242 0 0 862.834 100.0% 2.588.502 100.0%
600.3 Biaya Pemupukan 1.198.771.797 111.857 15.642.959.703 1.373.515 21.334.535.876 1.990.719 20.398.162.087 1.791.041 -14.444.187.906 -1,204.9% 936.373.789 4.4%
600.31 Biaya Tunas 328.231.300 30.627 271.982.654 23.881 984.693.900 91.881 836.561.203 73.453 56.248.646 17.1% 148.132.697 15.0%
SUBTOTAL SUB TOTAL BIAYA PEMELIHARAAN KEBUN (A) 3.362.670.184 313.770 18.131.444.112 1.592.014 27.838.617.417 2.597.613 26.804.841.733 2.353.573 -14.768.773.928 -439.2% 1.033.775.684 3.7%
B. B. BIAYA PANEN & PENGANGKUTAN TBS
601.10.00000 Gaji & Biaya Sosial Pengawas 305.980.196 28.551 292.858.084 25.714 917.940.588 85.653 740.233.539 64.995 13.122.112 4.3% 177.707.049 19.4%
601.01 Upah & Biaya Sosial Pemanen 3.737.785.446 348.772 3.752.230.672 329.461 11.136.396.258 1.039.134 9.060.393.088 795.539 -14.445.226 -0.4% 2.076.003.170 18.6%
601.02 Biaya Premi 863.130.694 80.538 958.420.005 84.153 2.548.445.146 237.795 3.244.165.730 284.851 -95.289.311 -11.0% -695.720.584 -27.3%
601.03 Peralatan Panen 40.691.670 3.797 48.420.873 4.252 121.457.931 11.333 348.018.144 30.557 -7.729.203 -19.0% -226.560.213 -186.5%
602 Biaya Pengangkutan TBS 0 0 16.294.305 1.431 0 0 51.240.996 4.499 -16.294.305 0.0% -51.240.996 0.0%
602.10 Pengangkutan TBS ke PKS 1.338.250.145 124.872 1.972.398.862 173.185 3.950.428.717 368.613 5.322.589.878 467.345 -634.148.717 -47.4% -1.372.161.161 -34.7%
SUBTOTAL SUB TOTAL BIAYA PANEN & PENGANGKUTAN (B) 6.285.838.151 586.530 7.040.622.801 618.195 18.674.668.640 1.742.528 18.766.641.375 1.647.787 -754.784.650 -12.0% -91.972.735 -0.5%
A + B SUB TOTAL BIAYA LANGSUNG (A + B) 9.648.508.335 900.299 25.172.066.913 2.210.209 46.513.286.057 4.340.141 45.571.483.108 4.001.359 -15.523.558.578 -160.9% 941.802.949 2.0%
C. C. ALOKASI BIAYA TAK LANGSUNG / OVERHEAD
603.90.00000 Alokasi Biaya Tak Langsung (Umum) 3.264.450.179 304.605 4.072.529.497 357.584 8.651.559.593 807.274 10.744.161.932 943.381 -808.079.318 -24.8% -2.092.602.339 -24.2%
SUBTOTAL SUB TOTAL BIAYA TAK LANGSUNG (C) 3.264.450.179 304.605 4.072.529.497 357.584 8.651.559.593 807.274 10.744.161.932 943.381 -808.079.318 -24.8% -2.092.602.339 -24.2%
GRAND TOTAL TOTAL HPP (A + B + C) 12.912.958.514 1.204.904 29.244.596.410 2.567.793 55.164.845.650 5.147.415 56.315.645.040 4.944.740 -16.331.637.896 -126.5% -1.150.799.390 -2.1%