NO SANDI JENIS PEKERJAAN / URAIAN PEKERJAAN BULAN SEMUA BULAN (AKUMULASI) SD BULAN SEMUA BULAN (AKUMULASI) VARIANCE BI VARIANCE SDBI
BGT AKT BGT AKT
10.717 Ha 11.315 Ha 10.717 Ha 11.315 Ha
171.726.629 Kg 145.764.090 Kg 171.726.629 Kg 145.764.090 Kg
16,02 Ton/Ha 12,88 Ton/Ha 16,02 Ton/Ha 12,88 Ton/Ha
Total Rp/Ha Total Rp/Ha Total Rp/Ha Total Rp/Ha Rp % Rp %
A. A. BIAYA PEMELIHARAAN KEBUN (TANAMAN MENGHASILKAN)
600.10.00000 Biaya Pengawas 1.770.073.389 165.165 1.487.140.399 131.428 1.770.073.389 165.165 1.487.140.399 131.428 282.932.990 16.0% 282.932.990 16.0%
600.11 Biaya Pemeliharaan Jalan & Jembatan 6.293.923.047 587.284 6.536.580.452 577.679 6.293.923.047 587.284 6.536.580.452 577.679 -242.657.405 -3.9% -242.657.405 -3.9%
600.12 Biaya Pemeliharaan Saluran Air 1.345.401.531 125.539 2.703.004.828 238.882 1.345.401.531 125.539 2.703.004.828 238.882 -1.357.603.297 -100.9% -1.357.603.297 -100.9%
600.13 Biaya Pemeliharaan Bangunan Konservasi 0 0 79.296.789 7.008 0 0 79.296.789 7.008 -79.296.789 0.0% -79.296.789 0.0%
600.15 Biaya Menyisip 250.664.058 23.389 121.175.209 10.709 250.664.058 23.389 121.175.209 10.709 129.488.849 51.7% 129.488.849 51.7%
600.17 Biaya Pengendalian Lalang 85.530.636 7.981 0 0 85.530.636 7.981 0 0 85.530.636 100.0% 85.530.636 100.0%
600.18 Pemeliharaan Gawangan 3.265.030.647 304.659 3.242.763.180 286.583 3.265.030.647 304.659 3.242.763.180 286.583 22.267.467 0.7% 22.267.467 0.7%
600.19 Pemeliharaan Piringan 2.442.648.159 227.923 1.920.516.526 169.728 2.442.648.159 227.923 1.920.516.526 169.728 522.131.633 21.4% 522.131.633 21.4%
600.2 Pemeliharaan Pasar Pikul & TPH 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.21 Titi Panen 46.171.998 4.308 0 0 46.171.998 4.308 0 0 46.171.998 100.0% 46.171.998 100.0%
600.22 Biaya Pengendalian Hama dan Penyakit 469.114.596 43.773 1.522.919.494 134.590 469.114.596 43.773 1.522.919.494 134.590 -1.053.804.898 -224.6% -1.053.804.898 -224.6%
600.23 Biaya Kastrasi/Sanitasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.24 Biaya Sensus 389.732.760 36.366 101.454.725 8.966 389.732.760 36.366 101.454.725 8.966 288.278.035 74.0% 288.278.035 74.0%
600.25 Konsolidasi 0 0 0 0 0 0 0 0 0 0.0% 0 0.0%
600.26.00000 Peralatan & Perlengkapan 99.739.722 9.307 156.147.018 13.800 99.739.722 9.307 156.147.018 13.800 -56.407.296 -56.6% -56.407.296 -56.6%
600.27 Biaya Analisa 90.296.082 8.426 82.893.811 7.326 90.296.082 8.426 82.893.811 7.326 7.402.271 8.2% 7.402.271 8.2%
600.29.00000 Lain-Lain 7.765.506 725 0 0 7.765.506 725 0 0 7.765.506 100.0% 7.765.506 100.0%
600.3 Biaya Pemupukan 62.813.393.812 5.861.099 40.571.207.521 3.585.533 62.813.393.812 5.861.099 40.571.207.521 3.585.533 22.242.186.291 35.4% 22.242.186.291 35.4%
600.31 Biaya Tunas 2.954.081.700 275.644 2.107.029.123 186.211 2.954.081.700 275.644 2.107.029.123 186.211 847.052.577 28.7% 847.052.577 28.7%
SUBTOTAL SUB TOTAL BIAYA PEMELIHARAAN KEBUN (A) 82.323.567.643 7.681.587 60.632.129.075 5.358.444 82.323.567.643 7.681.587 60.632.129.075 5.358.444 21.691.438.568 26.4% 21.691.438.568 26.4%
B. B. BIAYA PANEN & PENGANGKUTAN TBS
601.10.00000 Gaji & Biaya Sosial Pengawas 2.753.821.764 256.958 1.755.566.091 155.150 2.753.821.764 256.958 1.755.566.091 155.150 998.255.673 36.3% 998.255.673 36.3%
601.01 Upah & Biaya Sosial Pemanen 38.047.432.122 3.550.194 21.405.687.758 1.891.756 38.047.432.122 3.550.194 21.405.687.758 1.891.756 16.641.744.364 43.7% 16.641.744.364 43.7%
601.02 Biaya Premi 8.730.661.311 814.655 9.746.042.098 861.319 8.730.661.311 814.655 9.746.042.098 861.319 -1.015.380.787 -11.6% -1.015.380.787 -11.6%
601.03 Peralatan Panen 414.440.101 38.671 603.092.483 53.299 414.440.101 38.671 603.092.483 53.299 -188.652.382 -45.5% -188.652.382 -45.5%
602 Biaya Pengangkutan TBS 0 0 119.892.838 10.596 0 0 119.892.838 10.596 -119.892.838 0.0% -119.892.838 0.0%
602.10 Pengangkutan TBS ke PKS 13.575.604.561 1.266.736 14.282.737.466 1.262.256 13.575.604.561 1.266.736 14.282.737.466 1.262.256 -707.132.905 -5.2% -707.132.905 -5.2%
SUBTOTAL SUB TOTAL BIAYA PANEN & PENGANGKUTAN (B) 63.521.959.859 5.927.215 47.913.018.734 4.234.376 63.521.959.859 5.927.215 47.913.018.734 4.234.376 15.608.941.125 24.6% 15.608.941.125 24.6%
A + B SUB TOTAL BIAYA LANGSUNG (A + B) 145.845.527.502 13.608.802 108.545.147.809 9.592.819 145.845.527.502 13.608.802 108.545.147.809 9.592.819 37.300.379.693 25.6% 37.300.379.693 25.6%
C. C. ALOKASI BIAYA TAK LANGSUNG / OVERHEAD
603.90.00000 Alokasi Biaya Tak Langsung (Umum) 27.754.803.831 2.589.792 32.021.303.435 2.829.925 27.754.803.831 2.589.792 32.021.303.435 2.829.925 -4.266.499.604 -15.4% -4.266.499.604 -15.4%
SUBTOTAL SUB TOTAL BIAYA TAK LANGSUNG (C) 27.754.803.831 2.589.792 32.021.303.435 2.829.925 27.754.803.831 2.589.792 32.021.303.435 2.829.925 -4.266.499.604 -15.4% -4.266.499.604 -15.4%
GRAND TOTAL TOTAL HPP (A + B + C) 173.600.331.333 16.198.594 140.566.451.244 12.422.744 173.600.331.333 16.198.594 140.566.451.244 12.422.744 33.033.880.089 19.0% 33.033.880.089 19.0%